ライフ、健康

元気で幸せで暮らすため いい生活習慣を身に付けまましょう

What details should be paid attention to in the process of making Rapid prototye

2021-02-22 15:56:34 | 不老長寿

What details should be paid attention to in the process of making Rapid prototye

An important role of Rapid Prototypes is to check whether the design of the drawing is reasonable. If the product designed by a product has not been improved in structure, function and other aspects

To verify a large number of production defects, and then put into production. This will cause huge economic losses.
So what details do we need to pay attention to in the production process of hand board proofing?

  1. When bonding ABS products, pay attention to the amount of glue more or less, do not have cracking phenomenon.


2. The production process and drawings should be carefully read

3. Manual grinding should grasp the dimension accuracy of the hand board.

4. When the acrylic hand board is bonded, there should be no cracks or bubbles.

5. Don't glue the wrong place, and don't have dislocation and gap during assembly.

6. The temperature of PC products should not be too high when it is put in the oven or blown by air duct

7. POM, nylon, aluminum alloy products can not be bonded, because the glue of these three materials is not stable, so try not to use CNC disassembly processing.

8. If the workpiece has R angle, don't make it into a right angle. If there is arc on the edge of the workpiece, you should also pay attention to it

9. In the aspect of fuel injection, there should be no color difference, paint dropping and other phenomena, and the dust point should be controlled during oil mixing and fuel injection.

10. Pay attention not to deform and shrink, not to have too many bubbles, and consider shrinkage.

 

Precautions during the decoration of container houses.

2021-02-22 10:44:28 | 不老長寿
The container houses realizes the energy-saving effect of the building through scientific and reasonable layout, such as the design of the building's own space form, envelope structure, building materials and structure.

The building energy-saving technology of container houses specifically refers to the realization of building needs through reasonable layout of building orientation, setting of shading, thermal insulation technology of building envelope, and design of building openings that are conducive to natural ventilation in building planning and design. Energy consumption of heating, air-conditioning, and ventilation is reduced.

Container houses addition technology: building shape factor is suitable for energy saving, orientation suitable for ventilation, sun room design, pebble wall energy storage, fixed shading, solar wind shaft, natural lighting, etc., through the shape and structure design of the building itself, energy saving and environmental protection are realized To achieve green effects, these are all additive technologies.

This is the reason why container houses are widely praised by people, and the most important point among them is the low price. The price of the container house itself is not high, so there is no need to make the interior decoration very luxurious. Customers can decorate according to actual needs. However, if you find a problem that is difficult to solve during the decoration process, you must contact the manufacturer in time.

container houses

Precautions during the decoration of container houses:

In order to ensure the decoration quality of the container houses, the selection of materials must meet the requirements, and the structural stability must be guaranteed. For example, the ceiling of the container house must be a fixed structure. When installing lamps and other lighting equipment, pay attention to whether the specifications are appropriate and cannot be damaged. The tightness of the structure of the house itself. Secondly, the outer surface and frame of the sandwich panel are made of steel. The interior insulation must be considered when decorating, so as not to cause undesirable conditions such as leakage of electricity to appear in the house.

Users must pay attention to the common problems in the above decoration, so as not to encounter various problems during the use process, which requires re-installation. After the container house is installed, the user must not change the structure of the house without authorization, nor disassemble any accessories at will, and cannot add or reduce the partition wall without authorization. If you must make changes, you can first consult a professional before making modifications. In addition, users should also do a good job in the maintenance and maintenance of container houses, and it is best to refresh them with paint every two years.

Before building a container houses, we must not only listen to professional and reasonable opinions, but also design the construction of the house. After doing the basic work carefully, we must pay attention to the details of each installation, such as The firmness of welding and so on. As long as the sturdiness and safety of the container house is ensured, the container houses can be used with confidence, and the living will be more comfortable.
 
 
 
 
 

What to pay attention to when buying barreled peanut oil

2021-02-22 10:44:28 | 不老長寿

Many consumers like to buy large-capacity barrels of peanut oil, thinking that it can save worry and is cheaper than the price of oil in small packages, but the editor reminds everyone to pay attention to an important problem: that is, peanut oil should not be stored for a long time, and it is easy to deteriorate. Because of grease Oxidation will occur automatically, and the oxidation of fats will produce many toxic oxidizing substances.If people eat oxidized fats for a long time, they will cause cell function failure and induce various diseases.

1. Try to buy products with brand awareness and high market share. When purchasing, pay attention to whether there is QS logo, peanut oil company name, peanut oil factory address, grade, production date, shelf life, etc. on the product label.

2. The purchase of barreled peanut oil firstly depends on whether there are oil traces on the barrel mouth. If there is, it means that the seal is not tight, which will cause the oil to be oxidized during storage. Secondly, it depends on whether there is precipitation at the bottom of the barrel and the oil with low processing accuracy. After being placed for a period of time, different degrees of precipitation will inevitably occur.

3. Look at the production date and shelf life. If the shelf life is more than one year, antioxidants are generally added. In addition, it is best not to buy oil that has a shelf life of one or two months. Because the oil that has been irradiated by the sun for a long time, the actual quality is It has dropped a lot during the warranty period.

4. For families with a small population and few fires, it is best to buy small-volume barrels of peanut oil.

1. When buying oil, choose the one with a relatively recent production date, and the closer it is, the more fresh it is.

2. Buy a small package of oil, convert it according to the amount of 25-30 grams per person per day, and use the amount that can be used in one and a half months. For example, if two elderly people are at home, try to buy a package of less than 1.8 liters, if you often eat at home For a family of three, you can buy 2.5 liters of peanut oil.

3.If you bought a large barrel of oil for convenience or cost-effectiveness, you can pour a part of it into the oil control pot, and then seal the large barrel with tape and place it in a cool, dry and dark place, so it is best to use it within 3 months.

4. If you choose to divide into small bottles and then eat, divide into clean vials, pay attention to the bottles should be dry, can not carry water, brown glass bottles are preferred.

 

How to choose ppr pipe fittings?

2021-02-21 15:08:42 | 不老長寿

There are many manufacturers of PPR pipe fittings and pipes. The raw material of PPR pipe fittings and pipes is polypropylene (random copolymer polypropylene). PPR pipe fittings and pipes are produced from different brands of raw materials. There are certain differences in performance, plus the level of production line. Different, the quality of PPR pipe fittings produced by various manufacturers has a large gap between good and bad. When using PPR pipe fittings, it must be inspected before installation, and the PPR pipe fittings can only be used after the quality is confirmed to be qualified. The selected ppr pipe fittings and pipes should first have the quality inspection report of the quality inspection department, and the ppr pipe fittings used for drinking water should also have the sanitary performance inspection report of the sanitary inspection department, and then the appearance quality of the pipes and fittings and the pipe should be inspected. Diameter and wall thickness, when inspecting ppr pipe fittings and pipes, the following items are mainly inspected according to national standards:

1. The appearance of ppr pipe fittings.

The color of ppr pipe fittings and pipes should be basically the same. The inner and outer surfaces of ppr pipe fittings and pipes should be smooth and flat without dents, bubbles and other surface defects that affect performance. PPR pipe fittings and pipes should not contain visible impurities; the surface of ppr pipe fittings should be smooth, flat, and not Defects such as cracks, bubbles, peeling and obvious impurities, severe shrinkage, uneven color, decomposition and discoloration are allowed.

2. The opacity of ppr pipe fittings.

Ppr pipe fittings and pipes should be opaque.

ppr pipe

3. Pipe diameter and wall thickness of ppr pipe fittings.

According to GB/T18742.2-2002 national standard, ppr pipe fittings are divided into five series according to size: S5, S4, S3.2, S2.5, and S2. There is a corresponding relationship between ppr pipe fittings and pipe series S and nominal pressure. The specifications of ppr pipe fittings are represented by pipe series S and nominal outer diameter dn* nominal wall thickness en. Ppr pipe fittings mainly inspect the nominal outer diameter, average outer diameter and The corresponding wall thickness of the pipe series, the socket size of the pipe fitting and the corresponding nominal outer diameter.

4. Physical and mechanical properties and chemical properties of ppr pipe fittings.

Whether the hydrostatic test of ppr pipe fittings, the mass flow rate of melt, the thermal stability test under hydrostatic state, the longitudinal shrinkage rate of the pipe, and the impact test of simple beams meet the national standards, the inspection of materials for ppr pipe fittings can be checked. The content of the report and the retest report.

5. Whether the sanitary performance of ppr pipe fittings meets the national standards.

Ppr pipe fittings and pipes This item can be used to check the sanitary performance inspection reports of ppr pipe fittings and pipes by the health inspection department.

6. Applicability of ppr pipe fittings and pipe systems.

After the ppr pipe is connected to the pipe, it should pass the combined test of 8760 hours of internal pressure and 5000 thermal cycles.

 

How to fix the frame of modern hinged bi-folding shower room?

2021-02-21 11:01:03 | 不老長寿

The modern hinged bi-folding shower room is an independent and comfortable bathing environment as well as a completely exclusive bathing space. After you purchase a modern hinged bi-folding shower room that you love, how to fix the frame during installation? The following shower room manufacturers come to analyze it for everyone.

The installation of a modern hinged bi-folding shower room is first to find a place, punch holes, and then fix the frame. More tools are needed for position finding and punching, and the operation is more complicated.

One: Determine the drilling position, use tape measure + pen

The shower room must be fixed. The fixing method is generally to use screws to leave the holes on the aluminum alloy frame on the wall. All that needs to be done is to mark the corresponding position on the wall. The method is to put the frame on the wall, make sure the position is correct with a tape measure, and then mark the wall with a pencil.

2: Punch holes, use percussion drills

After setting the position, the next step is to punch. Punching is also divided into two steps. First, use a circular percussion drill to make a shallower hole at the marked location on the wall; construction tips: the bathroom wall has been covered with bricks, which is relatively hard. In order to make drilling easier, you can wet the drill bit. In addition, you can pour some water while drilling; after drilling the prototype mark hole, the next step is to use a spiral with stronger impact. The drill is out. On the basis of the shallower holes that have been punched, make a deeper hole.

Three: Install rubber pellets, use a hand hammer

Before screwing the screws into the wall, you need to install the expansion rubber particles in the holes first. The rubber particles can better tighten the screws. Use a hand hammer to knock the rubber particles into the drilled hole.

4: Fix the frame, use an electric screwdriver

After the above steps are completed, you can install the shower room frame, put the bottom frame on the water retaining strip, and then fix the frame. The method is to use an electric screwdriver to drive the screws into the wall to fix the frame.