1. Before laying the HDPE geomembrane, the relevant documents of the civil engineering project should be verified.
2. Before the HDPE film is cut, its relevant specifications should be accurately measured, and then cut according to the actual conditions. Generally, it should not be cut according to the specifications.
3. When laying wholesale smooth HDPE geomembrane, the stress should be the least, and the raw materials should be saved as much as possible under the premise of ensuring the quality. Together, we guarantee quality.
4. The lap width of the joint between the smooth HDPE geomembrane and the film is generally not less than 10 cm, and generally, the direction of the weld is placed parallel to the maximum slope, that is, placed in the direction of the slope.
5. Generally, in the corners and deformed sections, the length of the joint should be as short as possible. Unless otherwise specified, welds shall be provided as far as possible within 1.5 m of the slope or stress convergence zone on a slope with a slope greater than 1:6.
6. HDPE geomembrane should avoid the occurrence of artificial folds during laying. When the temperature is low, it should be tightened and leveled as much as possible.
7. After the HDPE geomembrane is laid, the walking and moving things on the film surface should be reduced as much as possible. Any object that can damage the HDPE film should not be placed on the film or carried on the film to avoid
the film. Constitutes accidental damage.