January 13-18, 2019, St. Louis, Missouri,802 INTERIM SESSIONにおいて
4.1 IEEE 802 .11ay
IEEE802.11ay(Next Generation 60 GHz )(出典:http://www.ieee802.org/11/Reports/tgay_update.htm)は
Work Completed
27 submissions are covered during the meeting covering areas related to:
• Comment resolution on Letter Ballot 234 (Draft 2.0)
• Technical presentation
All open CIDs are reviewed, resolved, and approved
Coexistence assurance document (17/1288r3) is reaffirmed
Passed a motion to prepare D3.0 and start a 15 day recirculation Working Group technical letter ballot
Goals for March 2019 plenary
Comment resolution on D3.0
Technical presentation
Teleconference Schedule
February 27 (Wednesday), 10:00am ET – 11:30am ET
March 6 (Wednesday), 10:00am ET – 11:30am ET
を行いました。(出典doc.:IEEE802.11-19/0203r0)
4.2TG 802.15 TG4w LPWA
TG802.15 TG4w LPWA(出典:http://www.ieee802.org/15/pub/TG4w.html
)は
Meeting Achievements
Discussion on Coexistence Document
Updated interleaver for LDPC code
Drafting
Joint draft review with James
Discussion on future schedule
Next Steps
Update draft with James’ comments
Discussion of resolution to the comments in telephone conference
Submission of draft in TG review
Go for letter ballot after March meeting
Telephone conference call
Will be scheduled in the week between February 4th and February 8th
Doodle via e-mail reflector to find suitable date and time
Goal: Discussion of updated draft
を行いました。(出典: doc.IEEE802.15-19-0070-01-004w)
世界標準規格開発小電力無線IEEE802.11WLAN及びIEEE802.15WSN会合の有権者数を下記に示します。
IEEE802.11WLAN会合有権者2008年12月189名、2018年12月330名、IEEE802.15WSN会合2009年1月189名、2019年1月有権者85名
4.1 IEEE 802 .11ay
IEEE802.11ay(Next Generation 60 GHz )(出典:http://www.ieee802.org/11/Reports/tgay_update.htm)は
Work Completed
27 submissions are covered during the meeting covering areas related to:
• Comment resolution on Letter Ballot 234 (Draft 2.0)
• Technical presentation
All open CIDs are reviewed, resolved, and approved
Coexistence assurance document (17/1288r3) is reaffirmed
Passed a motion to prepare D3.0 and start a 15 day recirculation Working Group technical letter ballot
Goals for March 2019 plenary
Comment resolution on D3.0
Technical presentation
Teleconference Schedule
February 27 (Wednesday), 10:00am ET – 11:30am ET
March 6 (Wednesday), 10:00am ET – 11:30am ET
を行いました。(出典doc.:IEEE802.11-19/0203r0)
4.2TG 802.15 TG4w LPWA
TG802.15 TG4w LPWA(出典:http://www.ieee802.org/15/pub/TG4w.html
)は
Meeting Achievements
Discussion on Coexistence Document
Updated interleaver for LDPC code
Drafting
Joint draft review with James
Discussion on future schedule
Next Steps
Update draft with James’ comments
Discussion of resolution to the comments in telephone conference
Submission of draft in TG review
Go for letter ballot after March meeting
Telephone conference call
Will be scheduled in the week between February 4th and February 8th
Doodle via e-mail reflector to find suitable date and time
Goal: Discussion of updated draft
を行いました。(出典: doc.IEEE802.15-19-0070-01-004w)
世界標準規格開発小電力無線IEEE802.11WLAN及びIEEE802.15WSN会合の有権者数を下記に示します。
IEEE802.11WLAN会合有権者2008年12月189名、2018年12月330名、IEEE802.15WSN会合2009年1月189名、2019年1月有権者85名